ANZ Stadium Christchurch

Project Overview

We were contracted to provide a suspended access system to the camera platform on the Christchurch Temporary Stadium.

This included concept drawings, carrying out engineering and detailed working drawings that co-ordinated details with the main structural drawings.

The now not-so-temporary stadium, could be in operation until 2022 with the new AMI stadium due to be completed sometime after 2019. 

One city counsellor went on record saying the 2019 time frame was "really ambitious and unachievable" and he wanted it extended to 2025.

It is just as well our Monkey Toe products are built to last

Testimonial

The new AMI Christchurch Stadium was designed & built within 100 days! An astounding feat in itself & a true testament to the team involved, in terms of commitment, dedication & enthusiasm to make it happen. Monkey Toe arose to the challenge in both designing a creative solution to our access needs as well as delivering a quality product on site.

Well done to the Monkey Toe team & we look forward to working with you again."