Big Chill

Project Overview

What started in 1996 as BOP Transport has grown into a nationwide freight company providing chilled and frozen transportation.

To accommodate their growth, a new factory was built in East Tamaki. The specialised roof was constructed out of Bondor insulated panels and needed an access system that would protect the roof from excessive direct loads.

 

 

Working with Big Chill’s project team and Macrennie construction, Monkey Toe Group was able to develop a lightweight, high strength engineered system. This pipe rack and access system reduces structural loadings to the roof. The total weight is a fraction of structural steel options and reduces the number of roof penetrations required for the massive pipe works, valve stations and control systems located on the large roof.

Products used:      Walkways      Handrails    Stiles    Stairs    Ladders

 

Aluminium stair
Aluminium stair
Aluminium stair
Change of direction ladder
Fixing
Small stair and walkway
Walkway
Walkway and handrails
Lower walkway
Looking down stair
Galvanised handrail
Galvanised handrail on stair
Walkway
Ladder
Aluminium stair
Change of direction ladder
Fixing
Small stair and walkway
Walkway
Walkway and handrails
Lower walkway
Looking down stair
Galvanised handrail
Galvanised handrail on stair
Walkway
Ladder

Trusted By

Bunnings Fonterra Spark Auckland Airport Countdown Fletchers Westfield McDonalds Mitre 10 Pak n Save Naylor Love Frucor Kiwi Property AMP Capital Meridian Hawkins Construction