Plunket Ave

Project Overview

This large factory development for Orora Packaging in the heart of Manukau’s industrial development was managed by Federal Group.

The factory needed several large Air Handling Units (AHUs) to keep the building positively pressurised to keep out dust. It also had normal climate control systems.

With the project running to a tight schedule, the Monkey Toe platform was ideal to house the AHUs, delivering pre-engineered systems in a short time frame.

 

The lightweight design transfers the weight back to the purlins. As the platform was high and close to a drop off, the Monkey Toe handrail system simply bolted to the platform to make it safe and compliant.

Large open amply mesh allows for rain to easily wash through. The site also used a lockable ladder cover to limit access to the roof, caged ladders, smaller platforms and walkways.

Products used:     Condenser Mounts     Walkways     Ladders     Platforms     

Large platform
Ladder landing
Ladder with change of direction
Skywalk walkway
Small platform
Small ladder with lockable cover
Large platform
Steps with handrails
Large platform
Top section of ladder
walkway and stairs up to large platform
Large platform
Ladder landing
Ladder with change of direction
Skywalk walkway
Small platform
Small ladder with lockable cover
Large platform
Steps with handrails
Large platform
Top section of ladder
walkway and stairs up to large platform

Trusted By

Bunnings Fonterra Spark Auckland Airport Countdown Fletchers Westfield McDonalds Mitre 10 Pak n Save Naylor Love Frucor Kiwi Property AMP Capital Meridian Hawkins Construction