MONKEYTOE BRIDGES
Fast, efficient bridging
The standardized, modular Flyable Bridge is suitable for all environments and has been designed and engineered to stand the test of time.
Standard pre-engineered lengths entail set pricing, no site-specific design is necessary, streamlining the process for standardization and simplicity.
Our bridges are fully compliant with industry standards and certifications in New Zealand and Australia. We manufacture in accordance with Australasian Standards.
Designed and engineered in partnership with:
Manufactured from Marine-Grade lightweight Aluminium 6061T6.
Clear usable deck width of 1.2m wide.
Optional lengths up to 20m.
Simple bolt down connection.
Anti-slip decking surface.
Fast end-to-end service with Standard Design and Documentation
Design to comply with outdoor walking tracks and trails
Able to be flown in as a complete prefabricated structure.
Non-welded Structure, can be assembled on-site if required.
100 Year Design Life.
Product Range
Cost Effective
Over the life span, aluminium solutions offer cost savings through reduced maintenance and extended product life.
Compliant
Our products are specifically designed for access applications, meaning compliance is forefront in our design brief. Non-slip, barrier heights, stair pitch, bridge widths etc.
Easy to work with
As aluminium is lightweight and ductile, installation and changes on site are quick and easy.
Low maintenance
Due to the durable and corrosion resistance elements within aluminium.
Sustainable
Aluminium is 100% recyclable. Other traditional materials are not very recyclable – especially in NZ.
Durable
Monkeytoe products are manufactured in marine grade aluminium which has superior durability compared to traditional materials.
Lightweight
1/3 the weight of steel. Often lighter than timber and FRP.
Corrosion Resistant
Without any coatings required. Important in marine and high corrosion environments.
Why choose Aluminium?
100% RECYCLABLE
5% ENERGY USED
75% REUSED
Ready to discuss your next project?
0800 658 637
COMPLIANCE
The bridge is compliant in New Zealand and Australia.
The cost of Site Specific Engineering Sign off is $3,900AUD.