Geostabilization NZ Bridge

PRODUCTS USED

  • Bridges

The terrain is rough, not easy to access, and the benefit of the aluminium components made the transport of material much easier. Also, our install team has worked with the Monkeytoe Bridge product before. Assembly and the install was done in just two days from the laminated drawings we were provided with” – Geostabilization NZ Ltd.

Personnel needed access to a challenging worksite for a current project being carried out by Geostabilization NZ Ltd. The site’s location required staff to cross a small stream to complete their daily tasks. The Monkeytoe lightweight aluminium bridge provided an ideal temporary solution.

The bridge arrive at the sie as a modular flatpack kit, which was transported to the stream location in individual extrusions. Over the course of two days, the bridge was assembled on-site. The use of durable, lightweight aluminium made this solution possible, as there was no option for a helicopter lift or other similar methods to transport materials tot he site.