Benmore Dam
Sector
Industrial Plants

With the implementation of new H&S Workplace 2015 law, companies are now taking safe access to their machinery and assets very seriously.
Meridian Energy is a company that takes the care of their staff and contractors seriously, so they approached Monkeytoe for a solution to provide safe access to their six 16kV Circuit Breakers.

This was an area that had previously been accessed on a regular basis using temporary scaffolds.
Meridian recognised that this was a costly exercise and had the potential for damage to this critical equipment, so engaged Monkeytoe to provide full design, supply and installation.

Monkeytoe jumped at the challenge and provided a full ‘end to end’ solution, carried out this project within the Stations planned shutdowns and accordance with their strict H&S and Asset protection requirements.
To ‘cap off’ a successful installation, the CEO of Meridian Energy acknowledged the new facility, as impressed with the quality of work that had been carried out.

‘The bigger the challenge, the better the solution with Monkeytoe – Everything better’