We were contracted to provide a suspended access system to the camera platform on the Christchurch Temporary Stadium. This included the creation of concept drawings, followed by engineering and detailed working drawings that co-ordinated details with the main structural drawings.

The now not-so-temporary stadium could be in operation until 2022, with the new AMI Stadium due to be completed sometime after 2019. Made of aluminium, the Monkeytoe access system will last well beyond these dates.

 

The new ANZ Christchurch Stadium was designed & built within 100 days! An astounding feat in itself and a true testament to the team involved, in terms of commitment, dedication & enthusiasm to make it happen. Monkeytoe arose to the challenge in both designing a creative solution to our access needs as well as delivering a quality product on site.

Well done to the Monkeytoe team and we look forward to working with you again.


Fabric Structure Systems Ltd

More Projects Back To All Projects
Complete your file download
Please provide your details to download this file. You'll only have to do this once.