ANZ Stadium Christchurch

PRODUCTS USED

  • Walkways

 

SECTOR

  • Public/Community Cenres

We were contracted to provide a suspended access system to the camera platform on the Christchurch Temporary Stadium. This included the creation of concept drawings, followed by engineering and detailed working drawings that co-ordinated details with the main structural drawings.

The now not-so-temporary stadium could be in operation until 2022, with the new AMI Stadium due to be completed sometime after 2019. Made of aluminium, the Monkeytoe access system will last well beyond these dates.

 

CLIENT FEEDBACK

OTHER PROJECTS