[dsm_image_carousel gallery_ids="13482,13478,13480,13479,13497,13481" slide_to_show="3" speed="700" autoplay_speed="1600" space_between="18" arrow_position="inside" arrow_prev="on" arrow_prev_font_icon="4||divi||400" arrow_next="on" arrow_next_font_icon="5||divi||400" arrow_size="34px" dots="off" arrow_color="#ffffff" arrow_background_color="RGBA(255,255,255,0)" slide_to_show_tablet="3" slide_to_show_phone="2" slide_to_show_last_edited="on|phone" arrow_horizontal_position_tablet="" arrow_horizontal_position_phone="45%" arrow_horizontal_position_last_edited="on|phone" arrow_size_tablet="34px" arrow_size_phone="25px" arrow_size_last_edited="on|phone" _builder_version="4.27.4" _module_preset="default" custom_margin="||0px||false|false" animation_style="slide" animation_direction="top" animation_duration="600ms" animation_intensity_slide="2%" hover_enabled="0" border_radii_arrow="on|50px|50px|50px|50px" locked="off" global_colors_info="{}" theme_builder_area="post_content" sticky_enabled="0"][/dsm_image_carousel]
Westmead Hospital Sydney

PRODUCTS USED

  • XBEAM Platform
  • HushMonkey Louvre-look Acoustic Barrier
  • Platform-mounted Louvres

 

SECTOR

  • Healthcare/Hospitals
We often talk here at Monkeytoe about our XBEAM platforms. But working with Westmead Hospital in Sydney gave us the chance to do something a little bit special: an XBEAM room.
 
When fitout and construction experts Renascent started work on the Westmead Hospital refurbishment, they knew that they needed a plant platform solution on the roof. A steel platform was designed but, as we know, the roof simply couldn’t have handled the weight of an almost 400sqm steel platform on it. So rather than add new supports into the roof and floors directly below the proposed platform, Renascent approached our Australian division looking for a solution.
 
Normally, a plant platform on a roof would include the likes of our Hushmonkey panels for both acoustic and visual minimisation, but in this case we were also tasked with designing a roofing frame from our extrusions to protect this platform from the elements.
 
It took some convincing to get the architect’s sign-off, but in the end we were able to deliver an impressive structure: around 28m long, 15 wide, and 5m high at the peak of the roof, with roofing sheet on the top and Hushmonkey panels as cladding on the long sides. The new structure now safely houses the HVAC and electrical/plumbing services needed, and looks great too – all while being a fraction of the weight of the proposed steel solution, and without requiring any additional building work or hot works on site.
 
With limited access to the site, our installers had to be quick so as not disrupt the busy, active hospital. Because our solution is a fraction of the weight of a steel solution, and didn’t require any hotworks on site, we were able to complete the fit-out over a Saturday morning. Little wonder Westmead Hospital and Renascent are chuffed with the result.
 
This has been a great chance for us to show what is possible with a dedicated design and install team, and the benefits of taking a leap with a new solution that really delivers.

OTHER PROJECTS

111 Bourke Street Office Tower Melbourne

111 Bourke Street Office Tower Melbourne

3 McNab Avenue Apartments Melbourne

3 McNab Avenue Apartments Melbourne

Manukau Bus & Train Interchange

Manukau Bus & Train Interchange

Victoria Lane Apartments Wellington

Victoria Lane Apartments Wellington

The Runholder Te Kairanga Winery Martinborough

The Runholder Te Kairanga Winery Martinborough

Woolworths Dunedin

Woolworths Dunedin

Thermosash

Thermosash

VUW Cotton & Laby Buildings Fall Arrest System

VUW Cotton & Laby Buildings Fall Arrest System

Bidfood Waipapa

Bidfood Waipapa

Waiopaoa Bridge

Waiopaoa Bridge

Te Hangaruru Flyable Bridge

Te Hangaruru Flyable Bridge

Tawa Loop Bridge

Tawa Loop Bridge

Foodstuffs New World Point Chevalier

Foodstuffs New World Point Chevalier

Christchurch Performing Arts Centre

Christchurch Performing Arts Centre

KiwiRail Bridge

KiwiRail Bridge

Wiri Reserve Bridges

Wiri Reserve Bridges

Primary Connect HVAC Platforms

Primary Connect HVAC Platforms

Thermal Dryer

Thermal Dryer

Geostabilization NZ Bridge

Geostabilization NZ Bridge

Maui B Taranaki Bridge

Maui B Taranaki Bridge

Whanganui Cycle Ramp

Whanganui Cycle Ramp

Cardinal Logistics Stair System

Cardinal Logistics Stair System

Auckland University Recreation Centre

Auckland University Recreation Centre

DOC Flyable Bridge

DOC Flyable Bridge

Costco Westgate Stair System

Costco Westgate Stair System

Lyttelton Port

Lyttelton Port

CFDC, Primary Connect

CFDC, Primary Connect

Christchurch Stadium

Christchurch Stadium

Waimea Dam

Waimea Dam

Westmead Hospital Sydney

Westmead Hospital Sydney

Graylees Bridge

Graylees Bridge

KiwiRail Mechanical Hub

KiwiRail Mechanical Hub

Diamond Harbour

Diamond Harbour

Alliance Mataura

Alliance Mataura

Invercargill CBD

Invercargill CBD

Timaru Showgrounds

Timaru Showgrounds

Fonterra Research & Development Centre

Fonterra Research & Development Centre

333 Remuera Road

333 Remuera Road

HOYTS Ormiston

HOYTS Ormiston

Tegel Mil

Tegel Mil

Wellington Ferry Terminal

Wellington Ferry Terminal

The Base

The Base

Fonterra Te Rapa

Fonterra Te Rapa

Greenleaf Fresh

Greenleaf Fresh

NZ Post

NZ Post

Air Chathams

Air Chathams

Te Arikinui Pullman

Te Arikinui Pullman

Tauranga Domain

Tauranga Domain

656 Great South Road

656 Great South Road

Transmisson Gully

Transmisson Gully

OJI Packaging

OJI Packaging

Risland Albany

Risland Albany

Christchurch Convention Centre

Christchurch Convention Centre

Ormiston Town Centre

Ormiston Town Centre

Whitcombe Valley DOC

Whitcombe Valley DOC

Lyttleton Port 2.0

Lyttleton Port 2.0

Sylvia Park Shopping Mall

Sylvia Park Shopping Mall

Westland Dairy

Westland Dairy

Oil Seed Products

Oil Seed Products

FreshChoice DC

FreshChoice DC

Cordis Hotel

Cordis Hotel

Vitaco

Vitaco

Mairangi Bay

Mairangi Bay

Nga Puna Wai

Nga Puna Wai

Spark Building

Spark Building

Benmore Dam

Benmore Dam

Bayleys House

Bayleys House

Lyttleton Port 1.0

Lyttleton Port 1.0

Queenstown Airport

Queenstown Airport

Maraetai Power Station

Maraetai Power Station

Scott Base

Scott Base

Momi Bay

Momi Bay

Five Mile Centre

Five Mile Centre

Christchurch Art Gallery

Christchurch Art Gallery

Waste Management

Waste Management

Nestle Marton

Nestle Marton

Kathleen Kilgour Centre

Kathleen Kilgour Centre

Hobsonville School

Hobsonville School

D72

D72

Cass Peak

Cass Peak

Cashel Square

Cashel Square

Burwood Hospital

Burwood Hospital

Bunnings Warehouse Riccarton

Bunnings Warehouse Riccarton

Big Chill

Big Chill

Auckland Airport

Auckland Airport

ANZ Stadium Christchurch

ANZ Stadium Christchurch

Airways AH Building

Airways AH Building

Middlemore Hospital

Middlemore Hospital

Dan Murphys Batemans Bay

Dan Murphys Batemans Bay

Coles Flagstone

Coles Flagstone

Bankstown Drycleaners Sydney

Bankstown Drycleaners Sydney

Royal Hobart Hospital

Royal Hobart Hospital

Aldi Croydon

Aldi Croydon

Capestone Village

Capestone Village

Preston High School

Preston High School

XBEAM Platform Lift

XBEAM Platform Lift

55 Corinthian Drive

55 Corinthian Drive

Marian College

Marian College

Project Kelly

Project Kelly

Richmond Quarter

Richmond Quarter

Carlaw Park

Carlaw Park